Jun 11, 2025
Routine
2 - self-closing / self-latching gates
13-202(a)(2) - pool must have self-closing and self-latching gates observed: Pool gates were not operational & unable to lock when wifi temporarily went out. Some gates did not have operational magnet locks. Corrected on site.
7 - ph between 7.2 and 7.8
13-189(c)(1)- pH of pool must be kept between 7.2-7.8. observed: Pool pH was 6.9; corrected to 7.3.
19 - adequate turnover rate
13-190(a) - the equipment shall be operated continuously to obtain the minimum required complete turnover of pool water every 6 hours & adequate flow to achieve this required turnover. observed: pool flow rate was 70 gpm, but required flow rate for pool is 133 gpm to achieve required turnover.
17 - skimmers/gutters maintained and operable
13-196(a)(4) - pools must have operational skimmers and weirs. observed: some weirs were missing; recommended to CPO to replace before next inspection. no imminent health hazards.