May 4, 2026
Permit/Opening
2291 DILLARD CROSSING TUCKER, GA 30084
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
emergency phone not working
FCL at 12.19ppm
2 skimmers filled with flowers and debris
Men's bathroom under construction and no out of order sign
Routine
Skimmers need to be cleaned.
Permit/Opening
Permit/Opening
13-202(m): Safety rules and regulations shall be conspicuously posted in pool area. Observed missing pool statements.
13-189(a)(5): All pools shall be kept free from sediment, dirt, or debris by frequently brushing and vacuuming of the bottom and sidewalls. Observed staining at the bottom of the pool.
Routine
13-189(C)(4) - POOL WATER SHALL BE TESTED FOR DISINFECTANT AND PH AT LEAST 2 TIMES EACH DAY. OBSERVED THAT POOL WAS NOT BEING TESTED TWICE DAILY.
13-202(I) - A WRITTEN COPY OF THE EMERGENCY ACTION PLAN SHALL BE LOCATED TO ALLOW FOR IMMEDIATE ACCESS IN CASE OF AN EMERGENCY. THERE WAS NO EMERGENCY ACTION PLAN ON SITE
Routine
13-190(A) EQUIPMENT SHALL BE OPERATED TO OBTAIN ONE TURNOVER EVERY 6 HOURS (166 GPM). OBSERVED FLOWMETER READING OF 120 GPM
13-189(C)(4) - POOL WATER SHALL BE TESTED FOR DISINFECTANT AND PH AT LEAST 2 TIMES EACH DAY. OBSERVED THAT POOL WAS NOT BEING TESTED TWICE DAILY.
13-190(a) - all circulation system components shall be maintained in a clean condition. Clean out skimmers daily
13-201(K) - AT ALL TIMES, SUPPLY OF LIQUID SOAP SHALL BE PROVIDED AND ACCESSIBLE TO USERS. OBSERVED NO LIQUID SOAP FOR SHOWERS
13-202(I) - A WRITTEN COPY OF THE EMERGENCY ACTION PLAN SHALL BE LOCATED TO ALLOW FOR IMMEDIATE ACCESS IN CASE OF AN EMERGENCY. THERE WAS NO EMERGENCY ACTION PLAN ON SITE
13-202(K) - FIRST AID KIT SHALL BE KEPT SUPPLIED, EQUIPPED TO TREAT AT LEAST 15 PEOPLE AND BE READY FOR USE
13-189(C)(1) - PROPER TEST KIT SHALL BE AVAILABLE. OBSERVED TEST KIT MISSING COMPARATOR
Permit/Opening
13-190(A) EQUIPMENT SHALL BE OPERATED TO OBTAIN ONE TURNOVER EVERY 6 HOURS. FLOWMETER READ 120 GPM. MINIMUM TURNOVER IS 166 GPM
13-202(I) - EMERGENCY ACTION PLAN MUST INCLUDE ALL REQUIRED SECTIONS. EAP MISSING "DRILL PROCEDURES"