Jun 9, 2026
Routine
16B - plumbing installed; proper backflow devices
Regulation: 511-6-1.06(2)(r) - system maintained in good repair (p, c)
Observed leak on the faucet of the prep sink. CA: A plumbing system shall be repaired according to law; and maintained in good repair. PIC will have faucet repaired.
15B - warewashing facilities: installed, maintained, used; test strips
Regulation: 511-6-1.05(3)(h),(i),(j) - temperature measuring device, manual warewashing; sanitizing solutions, testing device (pf)
Observed expired test strips (4/2026) in the facility. CA: A test kit or other device that accurately measures the concentration in mg/L of sanitizing solutions shall be provided. PIC will purchase new test strips ASAP.