Mar 20, 2026
Routine
5226 DAHLONEGA HWY CLERMONT, GA 30527
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Routine
Regulation: 511-6-1.06(1)(g),(h) - water supply, capacity; pressure (pf)
Observed water temperatures to be below required temperature thresholds. Please see notes for specific temperatures.
Water Supply, Capacity; Pressure (Pf) (g) Capacity.
The water source and system shall be of sufficient capacity to meet the peak water demands of the food service establishment. Pf
Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Pf (h) Pressure. Water under pressure shall be provided to all fixtures, equipment, and nonfood equipment that are required to use water except that water supplied as specified under subsection (1)(k)1 and 2 to a temporary food service operation or in response to a temporary interruption of a water supply need not be under pressure. Pf
Note: Facility shall repair or replace the non-functioning water heater. Facility will voluntarily cease food service until the water heater is repaired.
Routine
Routine
Routine
Routine