Apr 13, 2026
Routine
16A - hot and cold water available; adequate pressure
Regulation: 511-6-1.06(1)(g),(h) - water supply, capacity; pressure (pf)
Observed 3-copmarment sink, prep sinks, and mop sink to have peak temperature of 99°F upon arrival to inspection. Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Corrective Actions: PIC adjusted hot water heater and hot water at proper temperature was restored by the conclusion of the inspection.