Dec 17, 2025
Routine
16B - plumbing installed; proper backflow devices
Regulation: 511-6-1.06(2)(r) - system maintained in good repair (p, c)
No hot water available during inspection. CA: All plumbing shall be maintained in good repair.
13A - posted: permit/inspection/choking poster/handwashing
Regulation: 511-6-1.02(1)(f)(1) - permit, displayed (c)
Permit not hung up. CA: Permit shall be displayed in public view at all times. COS: Printed out and hung up during inspection.