May 27, 2026
Permit/Opening
3200 CYPRESS MILL RD BRUNSWICK, GA 31525
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(e ) - (e) water clarity shall be maintained. when standing at the pool's edge at the deep end, the main drain suction outlet covers or a four inch by four inch square marker tile in contrasting color shall be clearly visible. when standing at a spa's e
Observed water with low clarity with the MD covers unable to be seen at the time of this inspection. CA: Ensure water is clear enough to see the MD covers at all times.
Routine
Permit/Opening
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed an inoperable flow meter during the course of this inspection. CA: Repair or replace flow meter.
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed an inoperable flow meter during the course of this inspection. CA: Repair or replace flow meter.
Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal
Observed facility without documentation of the twice daily water tests and self inspection at the time of this inspection. CA: Ensure twice daily water tests are completed along with the daily self inspection with documentation.
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Observed high CYA level at the time of this inspection. CA: Ensure CYA does not exceed 90ppm.
Regulation: 511-3-5-.06(1)(l) - (l) open joints or gaps larger than three-sixteenths inch wide or with vertical elevations exceeding 1/4 inches shall be rectified using appropriate fillers. construction joints where pool coping meets the decks shall be watertight and shall not allo
Observed holes in the pool surfacing at the time of this inspection. CA: Repair holes before next permitting inspection or risk closure.
Permit/Opening
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Observed a low turnover rate at the time of this inspection. CA: Ensure turnover is raised to the minimum of 121Gpm.
Regulation: 511-3-5-.06(1)(f) - (f) the deck, including coping, shall have a minimum four feet width of continuous, unobstructed walking area maintained at all times unless otherwise allowed in the chapter.
Observed holes in the pool surfacing at the time of this inspection. CA: Repair holes before next permitting inspection or risk closure.
Routine
Regulation: 511-3-5-.06(1)(l) - (l) open joints or gaps larger than three-sixteenths inch wide or with vertical elevations exceeding 1/4 inches shall be rectified using appropriate fillers. construction joints where pool coping meets the decks shall be watertight and shall not allo
Observed cracked decking around the pool edge on the deep end side at the time of this inspection. CA: Facility will have this repaired to prevent possible injury.